Following a week of rain, the heat and dry conditions have returned and progress has really begun to ramp up again. XGD drainage installation is nearing completion with the pipe installation finishing up on Dogwood 7 and 8 ahead of final shaping. Grassing of Dogwood 7 green surround and around the bunker complexes was completed today and sprigging of the fairway and rough on Dogwood 7 will begin tomorrow before moving to Dogwood 8. The shaping of the new green on Dogwood 5 is complete and ready for drainage and mix installation. Fine tuning of the shaping will be completed tomorrow while irrigation and drainage will begin tomorrow and move though next week. Cart path work is ongoing as the removal and replacement of the path around the pickle ball courts is ongoing
|
Dogwood 8 approach drainage |
|
Dogwood 8 drainage around the sombrero |
|
Dogwood 7 fairway drainage |
|
Installation of XGD drainage on Dogwood 7 approach |
|
Dogwood 7 greenside bunker sodded and drained |
|
Watering new sod on Dogwood 7 green surrounds |
|
Dogwood 5 green subgrade |
|
Dogwood 5 subgrade |
No comments:
Post a Comment