Friday, May 13, 2022

Starting to take shape

 Magnolia 3,4, 5 and 6 are beginning to look like golf holes again as we get closer to the point of grassing.  TDI's goal from the beginning was to work from the inside, out with the construction process so access to golf holes isn't limited by completion.  So starting on Magnolia 3-6 made the most sense, and now one month in, these holes are nearly ready to have grass start hitting the ground.  We anticipate by the end of May, these holes will be ready to have the greens complexes grassed, along with the other feature slopes on Magnolia 3-6.  Feature slopes being bunkers and tee surrounds.  Below are several photos showing progress on these holes.


Magnolia 4 Tee cavity drained and read for greensmix


Installing greensmix on Magnolia 4 Tee complex


Magnolia 4 Tee cavity filled with greens mix and
 ready for irrigation installation.


Magnolia 4 greenside bunkers ready for drainage

Aerial photo of Magnolia 4 green complex.  Bunkers were wrapped
with plastic to protect edges from rain.




Fraze mowing process on Magnolia 4 fairway.

Fraze mower process removing top 1.5 inches of
dead grass and organic matter.


Magnolia 5 Tee complex shaping

Magnolia 5 green complex









No comments:

Post a Comment

Off to a good start

 The Team is getting pretty good at this renovation stuff.  As we settle in to year 3 of our project, both the Callawassie Team and the TDI ...