The First Test
Early yesterday afternoon, the new XGD drainage system got its first test with a rain storm that dumped nearly two inches of rain with most of that coming down over an hour. The system performed exceptionally well in all areas that it has been installed. During the storm all of the 4” lateral pipes that the XGD drain lines tie into were inspected for proper water flow. It was great to see just how fast that water was draining and flowing through the pipes. It was also nice to be able to drive completed fairways without leaving a single tire track. Holes that have not had new drainage installed on them were leaving muddy tire tracks when driving across them.
Puddling Around Basins
For those of you that live on Magnolia or that drive by you will notice some pretty large areas of standing water next to basin pipes. Do not be alarmed, the basin have yet to be cut down to allow water to flow into it. This is done on purpose because the final grading around these basins has yet to be completed. Once all grading is completed the pipes will be lowered and a 12” grate will be place on top. This will allow the water to flow into the pipe.
With the amount of drainage yet to be done around the course it is very reassuring to see what has already been done is working. Hopefully, these rain storms will be few and far between.
Ryan Watson
Golf Course Superintendent
No comments:
Post a Comment