Friday, March 25, 2022

Magnolia #4 main drain line installation

This week a small group from TDI began some work down the left side of Magnolia 4.  This work has been able to be done almost completely out of the way of play and giving them a nice head start before the full project begins. The crew has been installing a 6” drain line down the entire left side of the hole along with drain basins.  This will serve as the main drain line that all the fairway drainage will feed into and is very important.  This 6” drain line then ties into an existing storm basin.  This is one of the longer drainage runs that will need to be installed during the project and having it done beforehand will be very beneficial.  With the rain event throughout the day on Thursday preventing the crew from working we have already seen why this pre renovation work is very important. The crew hopes to have this run completed in the next couple of days and then move to Magnolia 3 to begin some more work out of play.  We look forward to April 4th and getting into the full swing of things and as much sunshine and warm weather as we can get. 



Ryan Watson

Golf Course Superintendent


Basin installation to capture surface water runoff

700-foot trench run with 6-inch ADS pipe to move water from tee complex to outfall


 Crew members tie-in 6-inch ADS pipe into existing basin

No comments:

Post a Comment

Off to a good start

 The Team is getting pretty good at this renovation stuff.  As we settle in to year 3 of our project, both the Callawassie Team and the TDI ...